Permit Fees

Operational Permit Fee Schedule

105.5.3 Amusement buildings$65/Annually
105.5.38/39 Places of Assembly$65/Event + Assembly Fee Table
105.5.5 Carnival & Fair
$65/Event
105.5.8 Combustible Fibers$65/Annually
105.5.9 Compressed gases$65/Annually
105.5.11 Cryogenic fluids$65/Annually
105.5.13 Dry cleaning w/hazardous solvent$65/Annually
105.5.15 Exhibits and trade shows$65/Per Event
105.5.16 Explosives$65/Annually
105.6.16 Flammable and combustible liquids$60/Annually
105.5.22 Hazardous materials$130/Annually
105..5.23 HPM facilities$130/Annually
105.5.24 High piled storage(exceeding 500ft2)$65/Annually
105.5.27 Lumber yards and woodworking plants >100,000bf$65/Annually
105.5.28 Liquid or gas fueled vehicles or equipment in assembly areas$65/Event
105.5.29 LP-gas 6101.2$65/Annually
105.5.30 Magnesium (>10lbs)$65/Annually
105.5.34 Open burning$65/Per Burn
105.5.36 Open flames and candles$65/Event
105.6.40 Pyrotechnic special effects materials$130.00 +$ 92/hr (min. 2 hrs.)/Event
105.5.43 Pyroxylin plastics$65/Annually
105.5.46 Rooftop heliports$65/Annually
105.5.47 Spraying or dipping$65/Annually
105.5.48 Storage of scrap tires$65/Annually
105.5.49 Temporary membrane structures and tents$65/Structure
105.5.50 Tire rebuilding plants$65/Annually


Assembly TableFee*Fire Staffing Requirements
1,000-1,500 Attendees$1252 Personnel
1,501-2,500 Attendees$2503 Personnel
2,501-3,500 Attendees$5004 Personnel
3,501+ Attendees$7004 Personnel

*Fire Staffing requirements are minimums required and are subject to change.

Construction Permits Fee Schedule

105.6.1 Automatic fire-extinguishing systems (Plan review and inspection)
$92 + (0.1%(Total fire flow calculation area))
105.6.3 Cryogenic Fluids
$92 + (Tank Fee Schedule)
105.6.4 Emergency Responder radio coverage system
$92 + (0.1%(project cost))
105.6.6 Fire alarm and detection system and related equipment
(Plan review and inspection)
$92 + (0.1%(Total fire flow calculation area)
105.6.8 Flammable and combustible liquids
$92 + (Tank Fee Schedule)
105.6.9 Fuel cell power systems
$92 + (1%(Project cost))
105.6.12 Hazardous materials
$92 + (0.1%(Project cost))
105.6.14 Industrial ovens
$92 + (0.1%(Project cost))
105.6.15 LP-gas
$92 + (Tank Fee Schedule)
105.6.22 Spraying or dipping
$92 + (0.1%(Project cost))


Tank Fee Schedule
Tank fee is added to the base fee for construction permit specified above.
Tank SizeCost
0-1,000 gal$150 per tank
1,001-5,000 gal$300 per tank
5,001-12,000 gal$400 per tank
12,001-20,000 gal$500 per tank
20,001+ gal$600 per tank
Each Dispenser with Sump$200 each
Fee includes plan review and inspection during normal business hours.**Inspections outside normal business hours (minimum 2 hours) @ $92/hr

Permit Fee Schedule